Innovating in the Design of Buildings with a Limited Lifespan
Reduce costs and implementation timelines of your operational activities.
-
- Designing a building adapted to constrained environments, often in conjunction with existing facilities
- Optimise costs and construction times for a limited-duration operation
- Incorporate a Lean approach without compromising on safety or environmental protection requirements, including on former sites
-
Orano has developed an innovative containment solution using a lightweight textile structure building as a secondary confinement barrier.
- Adapt the structure to the actual duration of the project, avoiding additional costs asscociated with oversized designs
- Significantly reduce construction time and cost with a faster-to-deploy structure that is simpler to dismantle than traditional heavy constructions
- Implement a solution that meets regulatory requirements and is validated by the Nuclear Safety Authority
- Adapt the structure to the actual duration of the project, avoiding additional costs asscociated with oversized designs
-
- Lightweight textile structure designed as a confinement barrier, replacing traditional nuclear buildings using a metal structure designed for conventional applications
- Ventilation, confinement, radiation protection, and monitoring requirements integrated from the design phase, in accordance with regulatory standards
- Engineering optimised to adapt to constrained environments and short life cycles
- Lean methodology applied to nuclear construction, resulting in reduced timelines, optimised costs, and limited environmental impact
- Flexible and adaptable solution suitable for various contexts in hostile environments
- Proven track record on a complex project involving the treatment and conditioning of legacy graphite-gas waste (Silo 130 – La Hague site)
-
-