Home
if (!lastItem) {
>
}
Nuclear Project & Industrial Engineering
if (!lastItem) {
>
}
Successfully Complete the Periodic Safety Reviews of your Installation
Effectively manage periodic reviews to ensure the lifetime extension and continuation of your nuclear facility's operations.
1
Challenges
Pass the compliance reviews of installations
including the effects of aging on equipment
Reassess risk control levels
by incorporating changes in regulatory standards
Ensure the required overall level of nuclear safety
Obtain authorization to continue operations
by providing robust and well-supported safety demonstrations
Efficiently mobilise the necessary resources and expertise
to complete the project within the specified timeframe
Control the performance
of the review process in terms of cost, quality, and timing
2
Our Solution
Benefit from a proven methodology
to efficiently manage your periodic safety reviews, based on experience with over 18 Orano nuclear facilities
Standardize documentation and input data
by developing a methodological framework
Mobilise an expert, multidisciplinary team,
including review advisors and a core group of technical and regulatory specialists
Adopt strategies and approaches that are proportionate
to the issues at stake and
adapted
to the constraints of nuclear facilities, including “fit-for-need” programs and well-structured documentation
Improve project timelines and costs
by standardizing input data and optimizing interactions with safety authorities
Pooling and using the OPEX
Cost control
3
Key Features
Recognized expertise
in compiling safety files proportionate to regulatory requirements
Demonstrated improvement
in project performance (cost, quality, schedule) during recent review campaigns
18 Orano installations
subject to periodic safety review requirements including operational facilities, units undergoing decommissioning, storage sites, and laboratories
12 facilities
already engaged in an industrialised review process since 2021
Active
contributions
to national and international operating feedback expert groups (CEA, EDF, ANDRA, IAEA, OECD/NEA)
Over 100 safety files submitted in the last 10 year
4
Alternatives & Options
Conduct Nuclear Safety Studies Answering the Authorities
4
Useful Links
Orano Projects