The TN Eagle has been designed from the outset to meet the operational and regulatory needs of nuclear operators.
- Weld-free, no machining design with reduced number of components: faster, more reliable manufacturing with minimal industrial constraints, enabling up to 100 years of safe dry storage
- Forged shell and thickened lids with high-performance metal seals, neutron shielding with VYAL resin for optimal containment
- Modular and scalable design: the TN Eagle adapts to any BWR or PWR fuel assemblies and their thermal loads, as well as your loading constraints
- Dual-purpose license (transport+storage) : regulatory approval simplification, time savings on procedures and reduced risk of reclassification
- Automated Factory 4.0 dedicated to assembly-production line: a controlled, reproducible manufacturing cycle and assembly leadtimes of less than 4 months
- Delivery lead times of approximately one year after order placement
The TN Eagle propose a high-perfomance answer to your safety, technical, and scheduling requirements
Single license for various cask dimensions
Delivery lead times of ~1 year after order placement